If you have watched my Youtube my videos you know that I have been working on the pond of a week and a half now ( I you haven't seen it yet here's the link: http://www.youtube.com/watch?v=JpxGzn0rbak ). It is definitely harder than I thought it would be, but the new revealing date is the end of this weekend. I should have a video up by Sunday about it. Meanwhile here are some pictures of what we got done last week (by the way it rained half of last weekend.)
Caption: Here is a side view of the top and the bottom of the waterfall
Caption: The front view of the pond
Caption: Pipe coming from bottom pond, under wall, and up to the top reservoir
Caption: Pipe leading from top of wall under wall to bottom pond (will later be filled back in with dirt)
Caption: Closer look at the top reservoir
I will post pictures later, because we have already put the top reservoir pond liner in since these pictures were taken. We will be working on the pond tomorrow until 3:00, and then the next day all day. That is if we don't finish on Saturday.
Thanks,
Blake